AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Feb 12, 2015

AD: Airbus Airplanes

AD NUMBER: 2015-02-24

PRODUCT: Certain Airbus Model A300 B4-2C, B4-103, and B4-203 airplanes; Model A300 B4-600, B4-600R, and F4-600R series airplanes, and Model A300 C4-605R Variant F airplanes (collectively called Model A300-600 series airplanes); and Model A310 series airplanes.

ACTION: Final Rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2007-03-18, AD 2008-17-02, AD 2012-08-03, and AD 2012-15-14, for the products listed above.

AD 2007-03-18, AD 2008-17-02, AD 2012-08-03, and AD 2012-15-14 required repetitive inspections of the forward lugs of the aft bearing at rib 5 of the main landing gear (MLG) on the left-hand (LH) and right-hand (RH) wings, and repair if necessary; and installation of new bushes with increased interference fit in the forward lug of the aft bearing at rib 5 of the MLG on the LH and RH wings.
 
This new AD adds airplanes to the applicability; and adds, for certain airplanes, repetitive inspections of the MLG rib 5 aft bearing forward lugs, and repair if necessary. This AD was prompted by reports of cracking in the forward lug of the MLG rib 5 aft bearing attachment.
 
The FAA is issuing this AD to detect and correct cracking of the forward lugs of the aft bearing at rib 5 of the MLG on the LH and RH wings, which could affect the structural integrity of the MLG attachment, resulting in possible MLG collapse during landing or rollout.
 
DATES: This AD becomes effective March 17, 2015.

FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC