Dreamliner Fuselage 'Mod' Underway On Test Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Sep 25, 2009

Dreamliner Fuselage 'Mod' Underway On Test Aircraft

787 Side Body Reinforcements Being Installed In Everett

Reinforcing modifications are underway on the Dreamliner #1 fuselage, as well as the static test airframe, according to a blog written by Randy Tinseth, vice president of marketing for Boeing Commercial Airplanes in Seattle.

Tinseth writes that new fittings at stringer attachment locations within the joint where the wing attaches to the fuselage are being mounted at the current time, and "work will get underway in the coming days on additional flight test airplanes."

ZA001 is in the paint hangar, Tinseth says, with the other 5 airframes at various locations around the Everett, Washington facility.

In a message sent to employees Wednesday, Commercial Airplanes president and CEO Jim Albaugh said "it’s important to remember that the 787 is truly the first new airplane of the 21st century. It’s a game-changer. And as such, it’s a departure from all commercial airplanes produced since Boeing launched the commercial jet age with the 707."

Airframe #5 Photo Credit Boeing

Albaugh admitted that the Dreamliner had not proceeded on schedule, but that "our team understands what needs to be done, from now through first flight and on into flight test and deliveries."

Boeing has told customers it still expects the first flight of the Dreamliner to come by the end of this year.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC