AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Jan 01, 2022

AD: The Boeing Company Airplanes

AD 2021-24-02 Prompted By Reports Indicating Incidents Of Wires Chafing

The FAA is adopting a new airworthiness directive (AD) for all The Boeing Company Model MD-11 and MD-11F airplanes.

This AD was prompted by reports indicating incidents of wires chafing against the inboard upper corner of the observer station circuit breaker panel. This AD requires, depending on airplane configuration, doing a general visual inspection of the right observer station upper main circuit breaker panel and wiring for certain missing parts; doing an inspection of the right observer station upper main circuit breaker panel to determine if a certain bracket part number is installed; doing a general visual inspection of certain wire assemblies for any damage; modifying the observer station upper main circuit breaker panel; and applicable on-condition actions. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective February 1, 2022.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to all The Boeing Company Model MD-11 and MD-11F airplanes.

The NPRM published in the Federal Register on August 18, 2021 (86 FR 46167). The NPRM was prompted by reports indicating incidents of wires chafing against the inboard upper corner of the observer station circuit breaker panel. In the NPRM, the FAA proposed to  require, depending on airplane configuration, doing a general visual inspection of the right observer station upper main circuit breaker panel and wiring for certain missing parts; doing an inspection of the right observer station upper main circuit breaker panel to determine if a certain bracket part number is installed; doing a general visual inspection of certain wire assemblies for any damage; modifying the observer station upper main circuit breaker panel; and applicable on-condition actions. The FAA is issuing this AD to address wire chafing and arcing on the panel, which could cause damage to equipment, and result in loss of electrical power and a possible in-flight fire.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Term (05.01.24): Say Altitude

Say Altitude Used by ATC to ascertain an aircraft's specific altitude/flight level. When the aircraft is climbing or descending, the pilot should state the indicated altitude round>[...]

ANN's Daily Aero-Linx (05.01.24)

Aero Linx: European Air Law Association (EALA) EALA was established in 1988 with the aim to promote the study of European air law and to provide an open forum for those with an int>[...]

Classic Aero-TV: Korean War Hero Twice Reborn

From 2023 (YouTube Version): The Life, Death, Life, Death, and Life of a Glorious Warbird In 1981, business-owner Jim Tobul and his father purchased a Chance-Vought F4U Corsair. Mo>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC