Endeavour Launch Pushed To May 10 ... At The Earliest | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.21.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, May 03, 2011

Endeavour Launch Pushed To May 10 ... At The Earliest

Faulty Load Control Assembly Box Must Be Replaced, Tested

NASA space shuttle and International Space Station managers met Monday and determined that Tuesday, May 10 is the earliest Endeavour could be launched on the STS-134 mission. That date is success oriented based on preliminary schedules to replace a faulty Load Control Assembly (LCA) box in the orbiter's aft compartment.  NASA technicians and engineers identified the LCA as the likely source of what caused heaters on a fuel line for space shuttle Endeavour's auxiliary power unit-1 (APU-1) to fail on Friday, scrubbing the first launch attempt for the STS-134 mission.

Plans are for managers to reconvene Friday to determine a more definite launch date after the box is removed and replaced and the retest of systems has been completed.

Space Shuttle Program managers adjusted the date after further evaluating the schedules to change out the box and retest the nine shuttle systems associated with the controller. That work would be followed by the standard closeout of the aft compartment before proceeding into the launch countdown.

Sunday night and Monday, technicians at NASA's Kennedy Space Center's Launch Pad 39A conducted additional testing of systems associated with LCA-2, including testing the box itself, which is expected to be removed late Monday or early Tuesday and replaced with an existing spare.

Managers will continue to evaluate the repair process and make any additional adjustments before scheduling Endeavour's next launch attempt for its STS-134 mission to the International Space Station.

The STS-134 crew is back in Houston and remains in quarantine throughout as it slowly adjusts its wake and sleep schedule to match the new launch time. While at NASA's Johnson Space Center, the crew will conduct a launch and landing simulation with its ascent and entry flight control team based in Mission Control, before returning to Florida for the launch countdown.

FMI: www.nasa.gov

Advertisement

More News

Samson Sky Hits the Wind Tunnel

Improvements Stack as Brand Readies for Mass Production Samson Sky updated followers on its flying car progress, describing some of the travails of the wind tunnel as they get clos>[...]

ANN's Daily Aero-Term (05.22.24): LAHSO

LAHSO An acronym for “Land and Hold Short Operation.” These operations include landing and holding short of an intersecting runway, a taxiway, a predetermined point, or>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (05.19.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Branch was founded in 1951 as the first constituent organization of the Aerospace Medical Association (AsMA). In 2006>[...]

ANN's Daily Aero-Term (05.19.24): Back-Taxi

Back-Taxi A term used by air traffic controllers to taxi an aircraft on the runway opposite to the traffic flow. The aircraft may be instructed to back-taxi to the beginning of the>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC