EXTRAORDINARY! Astronauts Complete Fifth/Final Hubble Repair Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, May 19, 2009

EXTRAORDINARY! Astronauts Complete Fifth/Final Hubble Repair Spacewalk

Truly Amazing Effort Ends With Triumph

NASA is rebuilding its can-do image this week with the apparently successful completion of the extremely aggressive Hubble repair mission.

STS-125 mission specialists John Grunsfeld and Drew Feustel completed the fifth and final spacewalk on the Hubble Space Telescope Monday at 3:22 p.m. EDT. Outside the airlock hatch, Grunsfeld said, "This is a really tremendous adventure that we’ve been on, a very challenging mission. Hubble isn’t just a satellite- it’s about humanity’s quest for knowledge."

He also thanked several people who contributed to Hubble and the servicing mission, then went on to say,

"A tour de force of tools and human ingenuity. On this mission in particular, the only way of finding the limits of the possible is by going beyond them into the impossible. On this mission, we tried some things that some people said were impossible….We’ve achieved that, and we wish Hubble the very best. It’s really a sign of the great country that we live in that we’re able to do things like this on a marvelous spaceship, like space shuttle Atlantis. I’m convinced that if we can solve problems, like repairing Hubble, getting into space, doing the servicing we do, travelling 17,500 mph around the Earth, we can achieve other great things, like solving the energy problems and climate problems- all of the things that are in the middle of NASA’s prime and core values. As Drew and I go into the airlock, I want to wish Hubble its own set of adventures and with the new instruments that we’ve installed that it may unlock further mysteries of the universe."

Grunsfeld and Feustel finished the mission’s battery replacement work. They worked in the telescope’s Bay 3 to replace the second of two battery modules. Each module weighs 460 pounds and contains three batteries, providing electrical power to support Hubble operations during the night portion of its orbit. The first battery module was installed during the second spacewalk.

They also replaced one of the telescope’s fine guidance sensors. The sensors are used to provide pointing information and also serve as a scientific instrument for determining relative position and motion of stars.

After those two tasks were accomplished, Feustel and Grunsfeld turned their attention to the New Outer Blanket Layer (NOBL) on the outside of the telescope’s Bay 5, Bay 8 and Bay 7, which normally face in the direction of Hubble’s orbital travel. These blankets were expected to deteriorate more in the space environment. The NOBL on Bay 8 was to be installed during the fourth spacewalk, but the crew was unable to accomplish it due to work on a stripped bolt.

Monday’s spacewalk lasted 7 hours and 2 minutes.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC