Second Production Kodiak Turboprop Completes Maiden Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Nov 09, 2007

Second Production Kodiak Turboprop Completes Maiden Flight

S/N002 Will Be First Customer Delivery

Quest Aircraft told ANN Friday of the successful first flight of S/N002, the second production Kodiak turboprop to take to the skies. The aircraft, which will be delivered to the customer early next month, flew for about an hour on Tuesday, November 6. S/N002 joins S/N001 and the Kodiak prototype in the fleet, as work on the production line continues to accelerate.

"The successful flight of our second production airplane is another milestone for the Kodiak program," said Paul Schaller, Quest Aircraft’s President and CEO. "This has been a remarkable year for Quest and we couldn’t have come this far without a lot of hard work and dedication on the part of everyone involved with the Kodiak program."

Piloted by Quest's Chris Klynstra, the aircraft took off at 1400 local time, flew to altitude and was put through its paces. Quest says the flight went exactly as planned, with no surprises.

Follow-up work on the aircraft is continuing, including installation of the interior. The aircraft will feature the 10-place Tundra interior.

As ANN reported, the Kodiak received FAA Type Certification on May 30. Quest says it continues to work the FAA to achieve its production certificate. The company reports a three-year order backlog, with interest from such market segments as personal use, Part 135 operations, government, and humanitarian organizations.

The aluminum-bodied Kodiak sports a Pratt & Whitney PT6 turbine engine, is capable of working off floats without structural upgrades and has the ability to land on unimproved surfaces. Quest says the Kodiak can take off in under 700 feet at full gross takeoff weight of 6,750 lbs with a useful load of 3,450 lbs and climb at over 1,700 feet per minute.

The Garmin G1000 integrated avionics suite is standard equipment on the Kodiak. Quest notes its G1000 was the first-such system installed in a turboprop aircraft; Cessna recently announced it, too, will offer the G1000 in its own Caravan single-engine turboprop.

FMI: www.questaircraft.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC