Ground Testing Underway For A400M | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Nov 15, 2009

Ground Testing Underway For A400M

EADS Hopes For First Flight By Year's End

The first Airbus Military A400M has been handed over to the Airbus "Flight Test" organization on 12 November, paving the way to the beginning of the various ground tests which are to be performed before the aircraft takes to the air before year end. The purpose of these ground tests is to verify that all aircraft systems, powerplant and flight test instrumentation work properly, in order to ensure a safe First Flight, and subsequently an efficient flight test campaign.

The ground tests include static tests and engine run-ups during which the interaction between all systems, the powerplant and the aircraft is controlled and validated. The correct operation of the telemetry system which will be subsequently used to follow the flights during the development campaign will also be checked during these ground test campaign. Following satisfactory completion of the static tests, the first taxi runs can start. These begin with low speed taxis (up to 60 kts) and brakings, and are to be followed by high speed trials with a rejected take-off at about 120 kts. During these trials, the behavior of all systems, and the turboprop engines, as well as the reaction of the aircraft to braking and lateral control, is thoroughly checked.

After each trial a thorough analysis of the findings as well as the status of the aircraft will determine when the next trial will take place, leading to a first flight before year end.

FMI: www.eads.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC