L-3 Selected To Develop Avionics For Ares I First Stage Booster | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Nov 09, 2007

L-3 Selected To Develop Avionics For Ares I First Stage Booster

Program Runs Through 2014

L-3 Communications announced Thursday its Cincinnati Electronics (L-3 CE) subsidiary has been selected by Alliant Techsystems to provide the avionics subsystem and components for NASA's Ares I launch vehicle. The approximately-$65 million program effort will run through June 2014.

L-3's efforts in the Design, Development, Test & Evaluation phase include design, development, qualification, certification, acceptance and delivery of Ares I First Stage Avionics Subsystem (AS) Line Replaceable Units (LRUs).

The First Stage LRUs L-3 is responsible for include the Booster Control Unit, Power Distribution Unit, Data Acquisition/Recorder Unit, Data Recovery Unit, Hydraulic Power Unit Controller, Ignition Separation Controller and the Recovery Control Unit.

"We are extremely pleased to have been selected by Alliant Techsystems to participate in this important new program for NASA's Ares I Launch Vehicle," said Dr. Jim Wimmers, President of L-3 CE. "This selection demonstrates ATK's confidence in L-3 as a key supplier of avionics technology."

As ANN reported, ATK is the prime contractor for the first stage of the Ares 1 crew launch vehicle.

FMI: www.l-3.com, www.atk.com, www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC