AD: Piper Aircraft, Inc. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Jul 13, 2017

AD: Piper Aircraft, Inc. Airplanes

AD NUMBER: 2017-14-04

PRODUCT: Certain Piper Aircraft, Inc. Models PA-28-140, PA-28-150, PA-28-151, PA-28-161, PA-28-160, PA-28-180, PA-28-181, PA-28-235, PA-28-236, PA-28R-180, PA-28R-200, PA-28R-201, PA-28S-160, PA-28S-180, PA-32- 260, PA-32-300, PA-32-301, PA-32-301T, PA-32R-300, PA-32R-301 (SP), PA-32R-301 (HP), PA- 32R-301T, PA-32RT-300, PA-32RT-300T, and PA-32S-300 airplanes equipped with oil cooler hose assemblies that do not meet certain technical standard order (TSO) requirements.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 95-26-13 for the airplanes listed above.

AD 95-26-13 required inspections, replacement, and adjustment of the oil cooler hose assemblies, as well as providing for a terminating action.

This AD retains all of the requirements of AD 95-26-13 and adds language to clarify those requirements.

This AD was prompted by several inquiries asking for clarification of the AD's applicability and compliance requirements.

The FAA estimates that this AD affects 23,643 airplanes of U.S. registry.

This AD retains the same actions as AD 95-26-13 and the costs do not add any cost burden than that already in effect by AD 95-26-13. The difference in the Costs of Compliance with this AD and AD 95-26-13 is that we use $85 an hour as a labor rate in 2016 as opposed to $60 per hour in 1995. The total cost estimate per airplane is $642.50, according to the FAA.

DATES: This AD is effective August 15, 2017.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC