Epic Aircraft Approved For Type Inspection Authorization | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Jul 24, 2019

Epic Aircraft Approved For Type Inspection Authorization

E1000 Type Certification Remains On Schedule For Year-End 2019

Epic Aircraft, manufacturer of high performance, all carbon fiber, single-engine turboprop aircraft, today announced it has been approved for Type Inspection Authorization (TIA) by the FAA. TIA allows FAA pilots to conduct the final phases of conformity inspections and flight testing. It is also a crucial precursor to type certification (TC), as it confirms the aircraft design, structural and flight test results demonstrate compliance with FAA regulations. Just days ago, Epic also completed the last of over 4000 company-conforming flight tests, concluding another key certification milestone.

“We are on the verge of bringing to market a truly superior aircraft design that will redefine industry expectations. Entering this final phase of flight testing is a tremendous achievement for our customers, our staff, and our E1000 certification program, keeping us on track for TC later this year,” said Doug King, Epic Aircraft CEO.

Epic launched FT1, its first flight test article, in December 2015. FT2, the second and final flight test article, joined the program in January 2018. Both aircraft have flown over 1000 combined flight hours, completing all critical FAA test flight maneuvers and confirming handling quality and capabilities.

“In addition to complying with FAA-required protocols, flight testing allows us to assess, monitor and improve certain operational features and functions,” explains King. “Last year, we saw an opportunity to boost engine performance by further optimizing the airflow induction system. As a result, we are now seeing industry leading cruise and climb rates throughout the FL340 service ceiling.”

“We also enhanced pilot safety and ease of use with improved lighting, rigging, flight controls positions, and a stick/shaker pusher stall protection system,” added King. “While these enhancements caused some delays, we believe the performance and safety benefits justified the schedule tradeoffs.”

The company completed structural testing last summer, one of the more demanding phases of its TC program, as FAA-mandated structural strength requirements for carbon fiber designs are higher than those imposed on metal aircraft.

Epic manufacturing has doubled its composite fabrication capacity, invested heavily in tooling and equipment, and refined workflows to accelerate E1000 production ramp. The company is currently running two production shifts, with plans to expand operations later this fall.

The first three E1000 customer aircraft are in various stages of fabrication, bonding and assembly, slated for delivery immediately following TC. Epic has nearly 90 confirmed E1000 reservations from around the US, as well as Canada, Mexico, Central/South America, Europe, Russia, South Africa and Australia.

Priced at $3.25 million fully-equipped, Epic offers uncompromising performance at a price point well below the competition. The sleek E1000 all-composite airframe, powered by the 1200- horsepower Pratt & Whitney PT6A-67A engine, cruises at speeds over 330 KTAS, with a range of 1,650+ nautical miles, and a full-fuel payload of 1,100 pounds.

(Source: Epic Aircraft news release. Image from file)

FMI: www.epicaircraft.com

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC