U.S. Marine Corps Has An Aviation Plan | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, May 13, 2022

U.S. Marine Corps Has An Aviation Plan

U.S. Marine Corps (USMC) Has A Plan For Aviation ‘Force Design 2030’

In a 200+ page document, the USMC’s Deputy Commandant for Aviation, Lt Gen Mark R. Wise outlined what they deemed an aggressive plan to evolve the USMC’s aviation division to play a key role in the force’s future. The ‘Force Design 2030’ is a roadmap they hope will help them transition the USMC into “a more agile expeditionary force.” The doctrine serves as a foundation to describe the forward-looking desired capabilities and concepts that will continue to provide a “warfighting advantage.”

‘Force Design 2030’ not only addresses its land, sea, and airborne assets, but also the human side, restructuring the organizational hierarchy from a linear to functional capabilities-based divisions, while moving away from a hierarchical system to a dynamic one in an effort to achieve greater agility, essentially decentralized units with decision-making authority at the lowest levels. The Force Design 2030 promises operation from austere distributed locations…across extended distances…minimally sustained…fully networked…and interoperable with the Join Force, America’s allies and partners.”

The plan uses the Cunningham Group Organizational structure, a 3-division unit that supports the assessment and planning for the USMC Aviation: 1) Future Capabilities, 2) Strategy & Wargaming, and 3) Operational Readiness, and it appears that the functional capabilities are aligned according to these three areas. In an interesting twist, their construction plan represents a philosophical shift from purpose-built to standard-built, which facilitates agility in unit laydown and deployments while also reducing dependency on specific home-basing locations, but more importantly, improve cost and resiliency.

FMI: https://marines.mil

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC