Boeing Receives Final 787 Major Structure In Everett | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, May 19, 2007

Boeing Receives Final 787 Major Structure In Everett

Now The Fun Begins... Assembly!

The puzzle pieces are all in place... now, Boeing has to put them together. Early Thursday, the planemaker received the final major assembly for the very first 787 Dreamliner at its Everett, WA plant.

The integrated midbody fuselage consists of section 43, a forward fuselage section made by Kawasaki Heavy Industries; section 11/45, the center wheel well and center wing tank, made by KHI and Fuji Heavy Industries and joined at FHI; and sections 44 and 46, center fuselage sections made by Alenia Aeronautica. It was joined at Global Aeronautica in Charleston, SC.

The fuselage measures 84 feet long and 19 feet in diameter.

Like other segments Boeing has received over the past several weeks, the fuselage segment was flown to Everett in the Dreamlifter, a specially modified 747-400 used to transport major 787 assemblies. The Dreamlifter touched down at 1:58 am Thursday morning.

Wrapped in black, the fuselage filled the cargo bay of the Dreamlifter. Barely six inches of clearance surrounded the structure.

"What an accomplishment for our entire 787 team," said Scott Strode, 787 vice president of Airplane Definition and Production. "This fuselage section represents the hard work of hundreds of people around the globe. The Dreamliner is no dream anymore - it's real, and it's here."

The fuselage was taken immediately into the 787 final assembly factory. Final assembly of the first 787 has not yet begun, but the delivery takes the team one step closer to that goal, and the planned July 8 rollout of the first completed plane.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC