Mon, Nov 07, 2005
Electronic Instrument
System Display Units 13/2005
Applicability: Airbus A330 aeroplanes, all certified
models, all serial numbers, equipped with Electronic Instrument
System EIS 2 software versions as follows:
a. Version L4-1 installed through either modification 51153 during
production
or Airbus Service Bulletin (SB) A330-31-3056 or A330-31-3057 whilst
in
service.
b. Version L5 installed through either modification 51974 during
production or
Airbus SB A330-31-3056 or A330-31-3069 whilst in service.
Requirement: Amend the Aircraft Flight Manual
(AFM) to incorporate the following operational procedure, this may
be accomplished by inserting a copy of this Directive or AFM
Temporary Revision (TR) 4.03.00/26 in the AFM:
“At each flight crew change, switch OFF all displays units
before completing
Parking Check-list.”
Note 1: As the flight crew will set all Display Units (DU) back ON
during the next
preliminary cockpit preparation, an electrical cut off of more than
5 seconds is thus
ensured, preventing automatic reset of DUs.
Note 2: Any later revision of the TRs approved by the European
Aviation Safety
Agency or any general AFM revision including this procedure is
acceptable for
compliance with this Directive.
Note 3: This operational procedure has been published in Operations
Engineering
Bulletin (OEB) 59/1.
Note 4: All Operator Telex (AOT) A330-31A3092 is cancelled.
Note 5: DGAC AD F-2005-166R1 (EASA approval 2005-6378) refers.
Compliance: Before 16 November 2005.
This Amendment becomes effective on 10 November 2005.
Background:
The Direction Générale de l’Aviation Civile of
France (DGAC) has advised that an operator reported the
simultaneous blanking of three EIS DUs on an A330 aircraft
during flight. These DUs went blank and displayed the message
“INVALID
DISPLAY UNIT”. The DU’s were recovered automatically
after approximately 40
seconds and the flight was continued normally.
The analysis of Display Management Computer (DMC) data confirmed
the three DUs
had undergone a simultaneous automatic reset followed by a power on
self-test. The
investigation shows that after a continuous power on of a DU for
more than six days,
an internal timer reaches a limit that provokes an automatic
reset.
A situation where both the EIS DUs and standby instruments are
simultaneously
unavailable may have unsafe consequences in certain phases of
flight.
The original issue of this Directive required the periodic
‘switching off’ procedure to
be performed by flight crew in accordance with DGAC AD UF-2005-166
before each
crew change.
This Amendment continues the ‘switching off’, but also
requires the AFM to be
amended.
The original issue of this Directive became effective on 28
September 2005.
More News
Instrument Approach Procedure (IAP) Charts Portray the aeronautical data which is required to execute an instrument approach to an airport. These charts depict the procedures, incl>[...]
“Our industry is approaching a 30-year innovation cycle, and we have less than 25 years to decarbonize aviation. We need to develop new methods to get net zero aerospace tech>[...]
Also: Girls in Aviation Day, B-29 Doc Heads 4 Chino, C-17 Tail Cone Detaches, Bulgaria Airshow Accident One of two private aircraft that launched from Apatity Airport near Murmansk>[...]
From 2021 (YouTube Version): We Were Blown Away At How Well The Nosewheel Was Adapted To The X Cub Airframe It should not be a secret to any one of you, that with thousands of hour>[...]
Also: Volato Nixed by Honda, New B-21 Bases, A-10 Unit Inactivated, Gogo/Airshare Boom Supersonic announced its demonstrator aircraft XB-1 successfully completed its third test fli>[...]