AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Feb 12, 2020

AD: Airbus SAS Airplanes

AD NUMBER: 2020-01-15

PRODUCT: All Airbus SAS Model A300 B4-600, B4-600R, and F4-600R series airplanes, and Model A300 C4-605R Variant F airplanes (collectively called Model A300-600 series airplanes), and certain Model A310 series airplanes.

ACTION: Final rule

SUMMARY: This AD was prompted by the FAA's analysis of the fuel system reviews on these models conducted by the manufacturer.

This AD requires modifying the fuel quantity indicating system (FQIS) to prevent development of an ignition source inside the center fuel tank due to electrical fault conditions.

This AD also provides alternative actions for cargo airplanes.

DATES: This AD is effective March 17, 2020.

COST: The FAA estimates that this AD affects 122 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

The FAA also estimates that it would take about 1,200 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. The FAA has received no definitive data that would enable us to provide cost estimates for the parts needed to do the required actions. Based on these figures, The FAA estimates the labor cost of this AD on U.S. operators to be $12,444,000, or $102,000 per product.

The FAA has not received definitive information on the costs for the alternative wire separation modification specified in this AD. The cost for this action in similar rulemaking on other airplanes, however, suggests that this modification could take about 74 work-hours, with parts costing about $10,000, for a total estimated cost to U.S. operators of $16,290 per product.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC