Kopter: SH09 Back 'Home' After Successful Flight Tests In Pozzallo | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Sep 17, 2020

Kopter: SH09 Back 'Home' After Successful Flight Tests In Pozzallo

Next Test Priorities Will Explore Capabilities Of The New Tail Rotor And Recent Aerodynamic Mods

Since the resumption of the test flight activities in June in Pozzallo, Sicily, Kopter's third prototype (P3) has completed 40 flights, allowing testing of multiple aerodynamic modifications and configurations. The current configuration fitted on P3 has seen a significant improvement in smoothness and stability.

Recent upgrades include an engine cowling extension for improved aerodynamics, a variable asymmetric tail plane at the best available incidence, the removal of the end plates and a larger upper vertical fin improving stability.

Richard Grant, Kopter Chief Test Pilot, commented: “P3 returns to Mollis a very different aircraft. The changes that have been implemented this year have made a real improvement to the handling of the aircraft. Now we are able to further expand the envelope and start to realize the aircraft’s true potential”

This most recent block of flight tests has been the most productive in terms of the number of modifications assessed and the general improvements realized. Early analysis and observations confirm the validity of the new design concepts. This achievement is a result of the work of all teams involved, utilizing the analysis and feedback from all the previous flight test blocks of P3. The SH09 is more and more reaching the planned overall performance and capabilities as development moves ahead.

For the next chapter in the SH09 evolution, P3 is back to the home facility in Mollis where upcoming upgrades require a strong support from the Engineering and Operations teams.

On return to Mollis, the test priorities are to explore the capabilities of the new tail rotor and the recent aerodynamic modifications throughout the low speed envelope and the upgrade to the final main rotor head and flight controls.

FMI: https://koptergroup.com/

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC