FAA-Conforming HondaJet Achieves Maximum Speed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Mar 30, 2011

FAA-Conforming HondaJet Achieves Maximum Speed

Aircraft Accelerated To 435 KTAS At FL300

The first FAA-conforming HondaJet light business jet has achieved a maximum speed of 425 KTAS (489 mph) at 30,000 ft. and a maximum Mach number of 0.72 above 30,000 ft. This achievement, announced Tuesday, surpasses the company's performance commitment of 420 KTAS for the production HondaJet.
The FAA-conforming HondaJet's maximum speed of 425 KTAS was recorded on March 11, 2011.

"Our flight tests indicate the aircraft is handling and performing as expected, with excellent control harmony and stability," said Michimasa Fujino, Honda Aircraft Company President & CEO. "The HondaJet's unique over-the-wing engine mount configuration and natural laminar-flow leading edge and fuselage nose designs significantly reduce drag and greatly contribute to such outstanding performance. In addition, the HondaJet's HF120 engines are exhibiting carefree handling of thrust and are supporting top-level performance and efficiency."

Honda will continue a rigorous series of in-flight mechanical, systems and handling tests on the FAA-conforming aircraft. Flight testing of the conforming HondaJet is taking place at Honda Aircraft Company's world headquarters facility in Greensboro, NC. To support its flight test program, Honda has completed its second FAA-conforming aircraft, which already has undergone numerous structural tests. Mating of the major components of the company's third conforming aircraft - to be used for mechanical systems flight testing - has been completed, and systems installation is now well underway on this aircraft. A fourth conforming flight test aircraft is in the final stages of mating of major assemblies and will soon enter the systems installation phase of completion. A fifth conforming aircraft also is scheduled to support additional structural testing.

While flight testing and the build of FAA-conforming aircraft continue, construction of the HondaJet production facility on the company's Greensboro campus nears completion. Honda soon will take occupancy of the 263,400 ft2 production facility and begin the process of moving equipment and personnel into the facility and undertaking pre-production preparations and training necessary to support HondaJet production ramp-up beginning in 2012.

FMI: www.hondajet.com

 


Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC