NOAA-N Prime Satellite Arrives At Vandenberg AFB | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Nov 06, 2008

NOAA-N Prime Satellite Arrives At Vandenberg AFB

Launch Scheduled In February 2009

The latest polar-orbiting operational environmental weather satellite developed by NASA for the National Oceanic and Atmospheric Administration, called NOAA-N Prime, arrived Tuesday by C-5A military cargo aircraft at Vandenberg Air Force Base, CA in preparation for a Feburary 4, 2009, launch.

NOAA-N Prime, built by Lockheed Martin, is similar to NOAA-N launched on May 20, 2005. The satellite will be launched from the Western Range at Vandenberg AFB by a United Launch Alliance two-stage Delta II rocket managed by NASA's Launch Service Program at the Kennedy Space Center, FL.

The satellite is the latest in the Advanced Television Infrared Observational Satellites -N series built by Lockheed Martin Space Systems Company. NOAA-N Prime will provide a polar-orbiting platform to support environmental monitoring instruments for imaging and measuring the Earth's atmosphere, its surface and cloud cover, including Earth radiation, atmospheric ozone, aerosol distribution, sea surface temperature, and vertical temperature and water profiles in the troposphere and stratosphere. The satellite will assist in measuring proton and electron fluxes at orbit altitude, collecting data from remote platforms and will assist the Search and Rescue Satellite-Aided Tracking system.

NOAA-N Prime will be prepared for launch in a NASA payload processing facility located on north Vandenberg AFB. On November 5, the satellite will be removed from its shipping container and rotated from the horizontal to vertical position. Spacecraft systems testing and launch preparations will then begin, which will take about a month.

Meanwhile, at the launch pad, the rocket that will launch NOAA-N Prime is a Delta II 7320 manufactured and prepared for launch by the United Launch Alliance. The first stage is scheduled to be erected on Space Launch Complex 2 on December 2. The three strap-on solid rocket boosters will be raised and attached to the booster the following day.

The second stage, which burns hypergolic propellants, will be hoisted atop the first stage on December 4. The fairing which will surround the spacecraft will then be hoisted into the clean room of the mobile service tower. The following week, as a leak check, the first stage will be loaded with liquid oxygen during a simulated countdown. The following day, a simulated flight test will be performed simulating the vehicle's post-liftoff flight events without fuel aboard. The electrical and mechanical systems of the entire Delta II will be exercised during this test.

In mid-January, the NOAA-N Prime spacecraft will be hoisted atop the Delta II at the launch pad. The following week, a final major test is then ready to be conducted, which will involve the Delta II and NOAA-N Prime working together. This will be a combined minus count and plus count, simulating all events as they will occur on launch day, but without propellants aboard the vehicle.

Finally during the last week of January, the fairing will be installed around the spacecraft.

FMI: http://goespoes.gsfc.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC