Airbus Conducts Flight Tests Of A400M Turboprop Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Dec 17, 2008

Airbus Conducts Flight Tests Of A400M Turboprop Engine

Plane Over 20 Years In The Making

It was a long time coming... but Airbus Military finally has some reason to cheer for its troubled A400M military transport program. The European company conducted the first test flight Wednesday of the TP400-D5 turboprop engine slated to power the airlifter.

The roughly one-hour initial flight tested the engine "to satisfaction," Airbus officials told Reuters.

The test was carried out near Cambridge, England. Somewhat ironically, the powerplant was tested on the wing of a converted Lockheed Martin C-130K... the very aircraft the A400M is slated to compete against.

Built by EPI Europrop International GmbH -- a joint effort between Rolls-Royce and Safran -- the TP400-D5 is the largest turboprop powerplant ever developed by Western nations. Four of the massive engines will power the A400M... an aircraft over 20 years, and $28 billion, in the making.

As ANN has reported, planning for the aircraft began in the mid-1980s, but several technical issues and a fair amount of political backbiting prevented the placement of first orders until 2003. To date, nine countries have signed on for a combined 192 aircraft... but they've faced a number of technical delays and even more excuses from Airbus since then.

Airbus owner EADS announced in September the A400M's first flight had been delayed until sometime in 2009, and attributed the delay to trouble with the engine program. Safran pointedly responded at the time that Airbus already had eight TP400s in their possession, enough to power the first two planes.

Company officials say Airbus will conduct 50 hours of trials before the A400M's first flight, which probably won't occur until the second half of next year. "Once this is achieved and sufficient maturity and satisfactory integration is also reached for the global propulsion system, it will be able to subsequently fly on the A400M," Airbus said.

On Tuesday, EADS announced a massive reorganization of its military activities, giving Airbus greater control over the A400M's development. It also sent a clear message to Airbus officials... that the euro stops with them.

FMI: www.airbusmilitary.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC