Was Hayabusa Damaged In Second Asteroid Landing Attempt? | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Nov 28, 2005

Was Hayabusa Damaged In Second Asteroid Landing Attempt?

Thrusters Latest Issue To Strike Trouble-Prone Probe

A Japanese spacecraft on an unprecedented mission to collect samples from an asteroid and bring them home to Earth is indeed on its way back -- but may have been damaged in landing.

All engines aboard the Hayabusa lander were shut down for a time as it hovered about three miles above the Itokawa asteroid. It had been vibrating as if one of its thrusters had developed a leak of some sort.

The probe now appears to be stabilizing, and the Japanese Space Agency JAXA will reportedly restart its engines December 10th for the long trek home.

It was the second landing attempt for Hayabusa. As was reported in Aero-News last week, JAXA lost touch with the spacecraft as it made its first attempt. It wasn't until the probe had lifted off again and communications were re-established that JAXA controller realized the Hayabusa ship had indeed landed, for approximately 30 minutes.

The question JAXA controllers were asking after that attempt is the same they're asking now: was the probe able to collect any samples from the asteroid's surface? The answer may not be apparent until the robotic spacecraft returns to Earth -- in June 2007.

FMI: www.jaxa.jp/index_e.html

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC