Generation Orbit Prepares For GO1 Wind Tunnel And Hot Fire Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Oct 29, 2016

Generation Orbit Prepares For GO1 Wind Tunnel And Hot Fire Testing

Tests Will Be Conducted At AFRL's Rocket Lab At Edwards AFB

Generation Orbit Launch Services (GO) has announced the award of a SBIR Phase II Extension from the Air Force Research Laboratory, Aerospace Systems Directorate, High Speed Systems Division (AFRL/RQHV) to enable wind tunnel and integrated hot fire testing of the GO1 hypersonic testbed. These efforts will further the development of the vehicle by validating aerodynamic models and demonstrating the functionality of the fully integrated GO1 rocket vehicle system. Wind tunnel testing will be accomplished at the AFRL Trisonic Gas Dynamics Facility and Mach 6 Wind Tunnel Facility at Wright-Patterson Air Force Base, OH. Integrated hot fire testing will be conducted at AFRL’s Rocket Lab test facilities at Edwards Air Force Base, CA.

“By the time these two test campaigns are complete, we’ll be well ahead of the curve in terms of our knowledge and understanding of how the vehicle hardware and software work” commented A.J. Piplica, Chief Operating Officer at GO. “The team is excited to apply what we’re learning here toward finalizing the detailed design of GO1 and pressing forward toward vehicle production and test flights in short order.”

Development of GO1 continues to progress on schedule to provide a unique flight test capability to the hypersonic and suborbital research communities. The system will enable long-duration, affordable access to high Mach number, endoatmospheric flight conditions necessary for maturing technologies, components, and subsystems relevant to high speed system architectures for both government and commercial applications.

(Image provided with Generation Orbit news release)

FMI: http://generationorbit.com

Advertisement

More News

ANN's Daily Aero-Term (12.19.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

NTSB Prelim: Cirrus Design Corp SR22T

During The 7 Second Descent, There Was Another TAWS Alert At Which Time The Engine Remained At Full Power On October 24, 2025 at 2115 mountain daylight time, a Cirrus SR22T, N740TS>[...]

Classic Aero-TV: The Red Tail Project--Carrying the Torch of the Tuskegee Airmen

From 2009 (YouTube Edition): Educational Organization Aims to Inspire by Sharing Tuskegee Story Founding leader Don Hinz summarized the Red Tail Project’s mission in simple, >[...]

Aero-News: Quote of the Day (12.19.25)

“This feels like an important step since space travel for people with disabilities is still in its very early days... I’m so thankful and hope it inspires a change in m>[...]

Airborne 12.17.25: Skydiver Hooks Tail, Cooper Rotax Mount, NTSB v NDAA

Also: New Katanas, Kern County FD Training, IndiGo’s Botched Roster, MGen. Leavitt Named ERAU Dean The Australian Transportation Safety Bureau (ATSB) has wrapped up its inves>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC