Generation Orbit Prepares For GO1 Wind Tunnel And Hot Fire Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Oct 29, 2016

Generation Orbit Prepares For GO1 Wind Tunnel And Hot Fire Testing

Tests Will Be Conducted At AFRL's Rocket Lab At Edwards AFB

Generation Orbit Launch Services (GO) has announced the award of a SBIR Phase II Extension from the Air Force Research Laboratory, Aerospace Systems Directorate, High Speed Systems Division (AFRL/RQHV) to enable wind tunnel and integrated hot fire testing of the GO1 hypersonic testbed. These efforts will further the development of the vehicle by validating aerodynamic models and demonstrating the functionality of the fully integrated GO1 rocket vehicle system. Wind tunnel testing will be accomplished at the AFRL Trisonic Gas Dynamics Facility and Mach 6 Wind Tunnel Facility at Wright-Patterson Air Force Base, OH. Integrated hot fire testing will be conducted at AFRL’s Rocket Lab test facilities at Edwards Air Force Base, CA.

“By the time these two test campaigns are complete, we’ll be well ahead of the curve in terms of our knowledge and understanding of how the vehicle hardware and software work” commented A.J. Piplica, Chief Operating Officer at GO. “The team is excited to apply what we’re learning here toward finalizing the detailed design of GO1 and pressing forward toward vehicle production and test flights in short order.”

Development of GO1 continues to progress on schedule to provide a unique flight test capability to the hypersonic and suborbital research communities. The system will enable long-duration, affordable access to high Mach number, endoatmospheric flight conditions necessary for maturing technologies, components, and subsystems relevant to high speed system architectures for both government and commercial applications.

(Image provided with Generation Orbit news release)

FMI: http://generationorbit.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC