1000th GE90 Engine Will Power An Emirates B777 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Oct 23, 2009

1000th GE90 Engine Will Power An Emirates B777

GE Has Doubled Engine Production In Three Years

GE Aviation has delivered its 1000th GE90 engine to Boeing for its 777 program. The engine, a GE90-115B engine, was recently shipped from GE's outdoor test facility in Peebles, Ohio, to Boeing's Washington facility to be installed on a 777-300ER aircraft for Emirates Airlines.

"It took 11 years to build 500 GE90 engines, and in a little more than three years, we doubled deliveries to 1000," said Tony Aiello, general manager of the GE90 Program at GE Aviation. "The feat demonstrates the industry's strong response to the Boeing 777 aircraft, which has revolutionized the way the aviation industry views big-twin engine aircraft."

As orders for the GE90-powered Boeing 777 aircraft have significantly increased over the last few years, the production rate for GE90 engines has also experienced dramatic growth from 20 engines per year to 160 engines per year. GE Aviation has an additional 560 GE90 engines in its backlog.

Of the 1000 engines delivered, 601 engines were GE90-115B, which power the Boeing 777-300ER, -200LR and 777 Freighter aircraft. At 115,000 pounds of thrust, the GE90-115B engine combines advanced technologies from the GE90 family with new, performance-enhancing features, such as a three-dimensional aerodynamic (3-D aero) compressor and wide-chord, swept composite fan blades for greater efficiency. The dual annular combustor emits no more than 40 percent of the hydrocarbons allowed by today's international standards. Since the GE90-115B engine entered service in 2004, the engine has accumulated more than 4 million flight hours and has demonstrated superior fuel efficiency as well as proving itself as one of the quietest engines per pound of thrust.

FMI: www.geae.com

 


Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC