Van's Aircraft Issues Service Bulletin For RV-12/12iS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Feb 07, 2020

Van's Aircraft Issues Service Bulletin For RV-12/12iS

WD-1201 Nose Gear Leg Replacement Program Published

Flyer/builder/owners of Van's thrifty little RV-12 have a Service Bulletin to look over.

Van's noted that, "An RV-12 training aircraft with more than 1700 hours of accumulated flight time recently experienced a nose gear fatigue failure. This is the only reported instance; no other fatigue-related nose gear failures have been reported. The failure occurred in the nose gear leg at the point where the leg tube meets the lower attachment bracket, and was caused by a fatigue crack that propagated across the tube. The crack occurred at a location that is not visually inspectable. It is, therefore, strongly recommended that owners of RV-12/RV-12iS aircraft with the original style nose gear leg (WD-1201) replace that part with the available updated, reinforced leg - part number WD-1201-1."

The SB applies only to original WD-1201 legs, which were shipped prior to June 10th, 2019. If you have received a WD-1201-1 gear leg since that time either with your kit or as a backorder item, it is not affected. They add that, "...In addition, only if your RV-12 or RV-12iS is currently under construction, and you received your finishing kit prior to June 10, 2019, and you have not yet completed the following steps in your plans, please contact Van’s Aircraft to order a replacement gear leg rather than ordering the retrofit."

FMI: www.vansaircraft.com/wp-content/uploads/2020/01/SB-19-08-26-Nose-Gear-Replacement.pdf

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC