DOT IG: FAA Completed STARS At Large TRACONs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Feb 12, 2018

DOT IG: FAA Completed STARS At Large TRACONs

But Challenges In Delivering NextGen Capabilities Remain

In a report requested by the U.S. House Committee on Appropriations, the DOT Inspector General says that while the FAA has completed the Standard Terminal Automation Replacement System (STARS) at 11 large terminal radar approach control (TRACON) air traffic facilities, the agency has experienced challenges in transitioning from the legacy system to STARS.

STARS is critical to achieving the expected benefits of the Next Generation Air Transportation System (NextGen), including enhanced capacity and reduced delays. STARS program risks, if not mitigated, could impact the long-term viability of NextGen. For these reasons, the House Appropriations Committee directed the IG's office to provide an update on FAA’s progress in implementing STARS at the 11 large TRACONs and determine how the effort will support NextGen capabilities.

According to the IG, despite having a detailed management plan for new STARS requirements, the FAA could not sufficiently document how new requirements were validated or prioritized. The IG office review also identified that FAA’s installation of STARS power systems do not comply with the Agency’s safety regulations and industry standards.

STARS supports several new NextGen capabilities at some of the 11 TRACONs, such as displaying ADS-B information for controllers. However, it does not yet fully support other capabilities that materially impact air traffic management, such as sequencing and spacing tools for controllers that facilitate the use of new performance-based navigation procedures. FAA is planning to establish a new phase of terminal automation to further address NextGen capabilities.

According to the report, the FAA concurred with three of recommendations made by the IG's office to improve implementation of STARS requirements and NextGen capabilities and partially concurred with one. Based on FAA’s response, The IG says all the recommendations are considered resolved and open pending completion of planned actions..

Recommendations Closed:

  • Finalize a timeline for identifying the remaining STARS requirements, including the additional requirements for the post-implementation enhancements
  • Implement a process in the FAA Requirements Management Plan to track and document when and how new requirements are validated and prioritized.
  • Redesign the power supply configuration of STARS rack assemblies to eliminate series connected power strips in the next STARS technical refresh of the 11 TRACONs.
  • Resolve the electrical configuration issue of the STARS rack assemblies at each of the 11 TRACONs by either: (a) obtaining approval for the configuration from a nationally recognized testing laboratory or (b) assessing and documenting risks posed by the STARS rack assemblies installed at each of the 11 facilities and FAA's acceptance of that risk on air traffic operations.

(Source: DOT IG news release. Image from file)

FMI: www.oig.dot.gov/library-item/36240

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC