Gulfstream Becomes First Part 91 Operator To Use New FAA Authorization Platform | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Sep 01, 2010

Gulfstream Becomes First Part 91 Operator To Use New FAA Authorization Platform

WebOPSS Streamlines Approval Process; Beneficial To Company, Customers

The Gulfstream Aerospace Corp. Flight Operations department has reduced the time it takes to receive a reduced vertical separation minimum (RVSM) Letter of Authorization (LOA) from two weeks to just a few days, according to the FAA.

The agency said Gulfstream Flight Ops is the first Part 91 operator to use the Web-Based Operators Safety System (WebOPSS) to process FAA-required operations documents, saving time for customers and the company. WebOPSS is the Internet platform for OPSS, an automated system that distributes standardized regulatory and policy requirements to the aviation community and collects and maintains operating authorizations for the FAA. Typical WebOPSS transactions involve the processing of documents such as an LOA or Master Minimum Equipment List (MMEL).

Gulfstream first used WebOPSS for an RVSM LOA for a Gulfstream G450 demonstrator. Without the RVSM LOA, the airplane would have been restricted from flying above FL290. Gulfstream has since used WebOPSS to process an RVSM LOA for a previously owned aircraft. LOAs are required by the FAA before an aircraft's RVSM capabilities can be demonstrated to customers. Usually, the LOA paperwork is sent back and forth, from operator to the FAA, through the mail. The entire process can take weeks.


G450 File Photo

 "The new system is a tremendous time savings for both parties - the FAA and Gulfstream," said Randy Gaston, vice president, Flight Operations, Gulfstream. "Our fleet changes regularly, so this new process will enable us to use the full operating envelope without being limited by lack of RVSM approval."

Besides streamlining the approval process, the benefits of WebOPSS include the ability to process authorizations from any location with Internet access and quick dissemination of FAA policies to operator and inspector communities. Digital signatures streamline the process for both the FAA and the operator.

FMI: www.faa.gov, www.gulfsream.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC