AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Oct 02, 2018

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2018-19-12

PRODUCT: Certain Bombardier, Inc., Model CL-600-2C10 (Regional Jet Series 700, 701, & 702), Model CL-600-2D15 (Regional Jet Series 705), and Model CL-600-2D24 (Regional Jet Series 900) airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2015-17-04, which applied to the aircraft listed above.

AD 2015-17-04 required replacement of left and right fixed control rods and lever assemblies of the elevator control system. This AD adds a detailed visual inspection of the key washers and self- locking nuts of the elevator control linkages and corrective actions if necessary.

This AD was prompted by reports of a disconnect between the elevator lever and control rod and a report indicating that certain revisions of the service information were missing instructions for proper installation of certain key washers.

DATES: This AD is effective October 31, 2018.

COST: The FAA estimates that this AD affects 549 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Replacement of fixed control rods and lever assemblies (retained actions from AD 2015-17-04) - 14 work-hours × $85 per hour = $1,190. Parts cost - $6,712. Total cost per aircraft - $7,902.
  • Detailed visual inspection of the key washers and self-locking nuts (new action) - 3 work-hours × $85 per hour = $255 per aircraft.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC