Stelia Aerospace Delivers First BelugaXL Fully Equipped Nose Section | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Jun 04, 2017

Stelia Aerospace Delivers First BelugaXL Fully Equipped Nose Section

Delivered To Final Assembly Line In Toulouse, France

Stelia Aerospace’s plant in Méaulte, France, delivered today the fully equipped nose section of the first BelugaXL, to its customer Airbus.

Transferred from Méaulte to the Beluga Final Assembly Line in Toulouse by BelugaST, this section boasts impressive dimensions: 40 feet long, 20 feet large, 13 feet high and a total weight of 8.2 metric tons. The installation of the aircraft’s systems represents some 3,900 feet of electric harnesses (37 miles of cables) and 1,300 feet of metallic and composite pipes.

Since January 2015, the teams of four Stelia Aerospace sites (Méaulte, Saint-Nazaire, Tunis and Toulouse) have worked closely with the Airbus teams in order to ensure the design, assembly and equipment of this emblematic section of the European aircraft manufacturer’s future super transporter.

The BelugaXL, a last generation aircraft, is the successor of the current BelugaST. The program was launched in November 2014, to address the increasing transport needs due to the production ramp-up. In this context, Airbus has decided to increase the capacity of its existing BelugaST fleet and to develop and manufacture five new BelugaXL, derived from its polyvalent long range aircraft, the A330.

After the design by Stelia Aerospace engineers in the Toulouse design office, the Saint-Nazaire site manufactured the pipes and managed the stretching and forming of the panels, as well as the manufacturing of several complex mechanical parts, while the Tunis site produced several metallic parts, and the Méaulte site managed the assembly and equipment of the section.

This is the first time the Méaulte site delivers a fully equipped nose section, therefore demonstrating its capacity to deliver a complete "Plug-and-Fly" section.

“Stelia Aerospace teams worked hard for 30 months in order to deliver, at the exact required date, this iconic section, with oversized dimensions and a state-of-theart design," said Cédric Gautier, CEO of Stelia Aerospace. "Moreover, this delivery of a fully equipped "Plug-and-Fly" nose section is a first for our Méaulte site."

(Image provided with Stelia news release)

FMI: www.stelia-aerospace.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC