F-35B Successfully Completes Wet Runway And Crosswind Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Aug 06, 2014

F-35B Successfully Completes Wet Runway And Crosswind Testing

Conducted Over 41 Days And 37 Missions

In an important program milestone enabling U.S. Marines Corps Initial Operational Capability (IOC) certification, the Lockheed Martin F-35B recently completed required wet runway and crosswind testing at Edwards Air Force Base, California.

"This testing is absolutely critical to 2B flight software fleet release and the Marine Corps' IOC," said J.D. McFarlan, Lockheed Martin's vice president for F-35 Test & Verification. "Collectively, the results support clearing the 20 knot crosswind envelope for Conventional Take Off & Landings (CTOL), Short Take Offs (STO) and Short Landings (SL), with ideal handling quality ratings and meaningful improvement over legacy 4th generational fighter aircraft."

The testing, completed in 37 missions during a 41-day period, achieved 114 test points, including 48 of 48 wet runway test points, four of four performance STOs, 12 of 18 unique flight test conditions for STO, 19 of 23 unique flight test conditions for SLs and all directional control and anti-skid wet runway testing. All testing was performed with BF-4, based at Naval Air Station Patuxent River, Maryland.

In other achievements, four aircraft surpassed flight hour milestones, demonstrating program maturity and reliability: F-35C aircraft CF-1 and F-35A aircraft AF-4 achieved 500 flight hours, and F-35C aircraft CF-5 achieved 100 flight hours.

(Image from file)

FMI: www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC