AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Apr 19, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-07-20

PRODUCT: Certain Boeing Model MD-11 and MD-11F airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2014-03-07, which applied to the aircraft listed above.

AD 2014-03-07 required inspecting certain locations of the wire bundles of the center upper auxiliary fuel tank for damage, and corrective action if necessary. AD 2014-03-07 also required installing nonmetallic barrier/shield sleeving, new clamps, new attaching hardware, and a new extruded channel.

This AD adds certain inspections and expands the applicability. This AD was prompted by the determination that it is necessary to require an inspection of the wire bundles for damage at certain center upper auxiliary fuel tank locations on certain airplanes.

DATES: This AD is effective May 21, 2018.

COST: The FAA estimates that this AD affects 125 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspection/installation [retained actions from AD 2009-26-16, Amendment 39-16155 (74 FR 69249, December 31, 2009)]: $29,988 to $43,475 per inspection cycle per aircraft for parts and labor.
  • Inspection/installation for Groups 1, 2, and 5, all Configuration 2 airplanes (retained actions from AD 2014-03-07): Up to $6,931 per aircraft for parts and labor.
  • Inspection/installation for Groups 1, 2, and 5, all Configuration 2 airplanes (new action): Up to $340 per aircraft for parts and labor.
  • Inspection/installation for Line Number 579 (new action): $28,345 per aircraft for parts and labor.
FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC