Australia Makes Changes To Instrument Rating And ATPL Flight Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, May 26, 2016

Australia Makes Changes To Instrument Rating And ATPL Flight Test

Applies To Both Fixed- And Rotary-Wing Licenses

Changes are being made to the flight test standards for instrument ratings and airplane and helicopter air transport pilot licences (ATPLs). The changes are being made to address an issue arising from the Airservices Australia Navigation Rationalization Project when, on May 26, 2016, 181 navigation aids will be decommissioned.

The related flight test standards will be amended in Schedule 5 of the Part 61 Manual of Standards. In particular, changes will be made to Appendices K.1 – ATPL(A), K.2 – ATPL(H) and M.1 – instrument rating.

The amendment will remove the requirement for applicants to demonstrate competency conducting an instrument approach operation using azimuth guidance. This change is necessary as many non-directional beacons (NDBs) won’t be available and many aircraft are not equipped to display data on an azimuth guidance indicator, other than an automatic direction finder (ADF).

Pilots are reminded of the 90 day recent experience rule contained in subregulation 61.870(6) for conducting instrument approaches using azimuth guidance. They should also be aware of the general rule contained in subregulation 61.860(5) for conducting an instrument approach operation using a particular kind of procedure such as an NDB. Together, these rules make sure pilots are competent using azimuth guidance indicators and conducting NDB approach procedures.

CASA expects the amendment to the Part 61 Manual of Standards will be made before May 26.

(Source: CASA Australia)

FMI: www.airservicesaustralia.com/projects/nrp/

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC