ASA Resumes CRJ Flights After Groundings | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Apr 05, 2009

ASA Resumes CRJ Flights After Groundings

Engine Inspections, Documentation Completed On 60 Aircraft

Normal flight operations were resumed Thursday afternoon by Delta Connection regional carrier Atlantic Southeast Airlines, a mere day-and-a-half after grounding 60 aircraft to check its compliance with mandatory engine inspections.

As ANN reported, Atlantic Southeast grounded 60 of its 112 Bombardier CRJ200s late Tuesday after internal audits raised questions about whether federally-mandated safety inspections to the aircrafts' General Electric CF34 turbofans had been performed. ASA spokeswoman Kate Modolo said the airline notified the FAA, and voluntarily pulled the aircraft out of service.

Modolo said that it was uncertain from the audit whether the inspections of some 87 engines on 60 aircraft were actually overdue, or had been performed but not properly documented. Inspections of the grounded planes' engines, normally required every 5,000 hours of operation, began Tuesday night.

"Safety is our number one priority, and we apologize for the inconvenience this has been causing the passengers," Modolo told the Atlanta Journal-Constitution, adding passengers "are being re-accommodated on next available flights."

USA Today reports the groundings caused the cancellation of 277 flights, affecting an estimated 8,500 passengers. Modolo said those passengers were rescheduled on other Delta Connection carriers and, in some cases, Delta itself.

FMI: www.flyasa.com, www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC