China Approves G1000 In Piper Archer Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jan 14, 2016

China Approves G1000 In Piper Archer Airplanes

CAAC Issues Amended Type Certificate For The Glass Panel

Piper Aircraft, Inc. has received an amendment to the Validation of its Type Certificate issued by the Civil Aviation Administration of China (CAAC) for the addition of Garmin G1000 avionics in the Archer training TX/LX aircraft. The approval was made by CAAC on December 21, 2015.

“CAAC’s approval of G1000 in the Archer is exceptionally exciting news for Piper and prospective customers in China,” said Piper President and CEO Simon Caldecott. “Our Chinese customers now have the ability to take advantage of the most current and advanced avionics in the cockpit, keeping with Piper’s continued commitment to safety, reliability, and value.”
 
With this new certification approval, the Archer G1000 joins the already approved and widely used twin-engine Seminole, offering Chinese flight schools the option of a complete advanced training fleet of common Piper products for single and multi-engine aircraft requirements.

Presently, five flight schools in China utilize the Seminole, with anticipated delivery to an additional school in April of this year. Archer deliveries are expected to increase in the coming year, as well.

(Source: Piper news release. Image from file)

FMI: www.piper.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC