AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Oct 15, 2019

AD: The Boeing Company Airplanes

AD NUMBER: 2019-20-07

PRODUCT: All Boeing Model 787-8, 787-9, and 787-10 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: This AD requires repetitive operational checks of the leading edge (LE) outboard (OB) slats and applicable on-condition actions.

This AD also requires revising the airplane flight manual (AFM) to prohibit flap retraction under icing conditions and revising the existing maintenance or inspection program, as applicable, to incorporate a new operation check.

This AD was prompted by a determination that the LE OB slat system could be out of position without flight deck annunciation.

DATES: This AD is effective October 11, 2019. The FAA must receive comments on this AD by November 25, 2019.

COST: The FAA estimates that this AD affects 118 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Repetitive operational checks: Labor - 8 work-hours × $85 per hour = $680 per operational check per aircraft.
  • AFM revision: 1 work-hour × $85 per hour = $85 per aircraft.
  • (Does not include estimated costs for revising the existing maintenance or inspection program)
FMI: AD

 


Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC