Boeing's 787 Does The Production-Line Shuffle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Jun 23, 2008

Boeing's 787 Does The Production-Line Shuffle

What's This... Actual MOVEMENT?

After months of delays, Boeing's troubled 787 Dreamliner program appears to be finally -- and cautiously -- back on track.

One day after announcing the successful power-on of the first 787 -- a milestone Boeing accomplished two weeks ahead of its latest revised schedule, though one year later than originally planned -- the planemaker moved its static test airframe from the final assembly building in Everett, WA to another production facility.

The move frees up room for the second flight-test 787 to move to the production bay. The first Dreamliner remains in the nose-to-door position and the third flight-test airplane is in the first position. It will remain there until the fourth flight-test airplane is ready for assembly to begin later this month.

If this sounds more like a logistics-related news item than a purely aviation story, well... you're right, but it also marks another milestone of sorts for the American planemaker.

After months of comparative inactivity -- as work crews fretted to essentially rebuild the first 787, which was unveiled last July -- the 787 production line is looking more and more like, well, an actual aircraft production line.

For the Dreamliner's 58 customers, that can't come a moment too soon.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC