NASA Issues RFP For Ares I Upper Stage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Feb 25, 2007

NASA Issues RFP For Ares I Upper Stage

Awards Turbine Pump Assembly To Hamilton Sundstrand

The plan for NASA's next generation space vehicle is starting to come together. On Friday, the space agency issued a request for proposal for the Ares I launch vehicle upper stage element. Ares I is the launch vehicle that will transport the Orion crew exploration vehicle and its crew and cargo to low Earth orbit.

The upper stage proposals are due to Marshall Space Flight Center no later than 1 p.m. CST April 13, 2007.

The request for proposal states the procurement approach for obtaining the upper stage element. The selected contractor will produce the required Ares I upper stage and provide support to a NASA-led design team during the design phase.

The contract will provide for the manufacture and assembly of test articles, flight test units, and the operational upper stage elements to support NASA's flight manifest through 2016. Final manufacturing and assembly will take place at NASA's Michoud Assembly Facility in Louisiana.

The Ares I upper stage, with a separately procured upper stage engine and a separately procured instrument ring, will provide the navigation, guidance, control and propulsion required for the second stage of the Ares I ascent.

The first stage will consist of a single reusable solid rocket booster and motor similar to those used on the space shuttle but with a fifth motor segment attached.

The contract to manufacture and assemble the Ares I upper stage element will be awarded through a full and open competition and managed by NASA's Marshall Space Flight Center in Huntsville, AL.

A selection will be made in August 2007.

NASA also announced Friday it selected Hamilton Sundstrand Space Systems International Inc. of Rockford, IL to design, develop, fabricate, test and deliver engineering models of a turbine pump assembly for the Ares I upper stage thrust vector control subsystem.

That two year, cost-plus-fixed-fee contract is worth approximately $5 million.

FMI: View The RFP, www.nasa.gov/ares

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC