AD: Bell Textron Canada Limited | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Nov 21, 2022

AD: Bell Textron Canada Limited

AD 2022-22-08 Requires A Repetitive Inspection For Delamination...

The FAA is adopting a new airworthiness directive (AD) for Bell Textron Canada Limited (type certificate previously held by Bell Helicopter Textron Canada Limited) Model 206L, 206L-1, 206L-3, and 206L-4 helicopters with a certain part-numbered main rotor (M/R) blade installed under Supplemental Type Certificate (STC) SR02684LA.

This AD was prompted by delamination of M/R blades. This AD requires a repetitive inspection for delamination, and depending on the results, removing the M/R blade from service and reporting certain information. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective December 23, 2022.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to Bell Textron Canada Limited Model 206L, 206L-1, 206L-3, and 206L-4 helicopters with a certain part-numbered M/R blade installed under STC SR02684LA. The NPRM published in the Federal Register on March 24, 2022 (87 FR 16652). The NPRM was prompted by testing by Van Horn Aviation, LLC (Van Horn), which revealed the potential for delamination in M/R blade part number (P/N) 20633000-101. Delaminations were then confirmed by inspection of in-service M/R blades. Testing by Van Horn confirmed that the 90° plies fail in spanwise tension (normal to the fiber direction) at the inboard end of the weight receptacle near M/R blade station 186.0. Delamination then propagates outboard from M/R blade station 186.0 at the interface between the 0° and 90° plies. According to Van Horn, fatigue testing has shown that the delamination initiates almost immediately and progresses slowly in a stable, predictable manner. The delamination has been found to develop first on the lower surface and grow outboard from the inboard end of the weight receptacle and forward of the balance weight pocket. After approximately 4 to 6 inches growth of the delamination on the lower surface, a similar delamination becomes detectable on the M/R blade upper surface. Should the delaminations continue to grow to the point of static overload, the receptacle could depart the M/R blade. In the NPRM, the FAA proposed to require, at specified intervals, removing the affected M/R blade, drawing rectangular inspection areas “Zone 1” and “Zone 2” with a permanent marker, tap inspecting the inspection areas for delamination, marking and measuring the length of any delamination, and depending on the results, removing the M/R blade from service. The NPRM also proposed to require reporting certain information to Van Horn. The FAA is issuing this AD to address the unsafe condition on these products.

FMI: www.regulations.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC