PW-4000 TEC Parts Supplier Re-Upped | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jan 08, 2022

PW-4000 TEC Parts Supplier Re-Upped

10-Year Contract to Provide Turbine Exhaust Cases Extended

Air Industries Group's Sterling Engineering subsidiary has been awarded a long term agreement to deliver Turbine Exhaust Case parts for the Pratt & Whitney PW-4000 jet engine in a contract extension expected to generate over $6 million in its lifetime. 

The PW-4000 is popularly used on the A-330 and Boeing 777, and the Sterling TEC is a vital piece of its safety. The 5' wide nozzle is vital to the high stress, high speed environment inherent to turbine engines. Sterling's performance in the contract thus far has allowed them to build a deep body of experience over the last 10 years of continuous production. The company offers the gamut of complex jet engine and helicopter components as well as those required for large industrial gas and steam turbines. The outfit offers 5-axis milling and turning up to 120 inches in their Connecticut base. Their inclusion in the Air Industries group allows for a wider engineering and technical base, whether projects require testing, manufacturing, or design under the subsidiaries' shared management team. 

Air Industries CEO Lou Melluzzo informed investors of the successful move to create enduring relationships with clients. “One of the key corporate objectives at Sterling Engineering is to transition a larger percentage of the product mix into long term agreements. Extending this Exhaust Case component for the “life of the program” confirms our customer’s confidence that we can produce it competitively and meet their delivery requirements. This award, together with the LTA for the CH-53K helicopter that we announced on October 13th of last year, furthers our progress with the transition of Sterling Engineering’s business.”

FMI: www.airindustriesgroup.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC