Mon, Oct 30, 2017
Testing Conducted At Arnold AFB In Tullahoma, TN
The F135 engine, which powers the fifth generation F-35 Lightning II, has successfully demonstrated full-life capability of its cold section (components consisting of the fan and compressor) during accelerated mission testing (AMT) at the Arnold Engineering Development Complex, located on Arnold Air Force Base in Tullahoma, TN. This achievement of 9,400 total accumulated cycles (TAC) – the equivalent of approximately fourteen years of operation or approximately 2,000 F-35 missions – was completed while running the engine at extreme conditions to simulate operational engines.
"Demonstrating the full life capability of the F135 engine's cold section represents a key milestone for the program," said John Wiedemer, vice president, F135 Program, Pratt & Whitney. "This milestone follows the successful full-life testing of the F135's hot section in 2015 and validates the excellent engine durability we're seeing in early fleet exposure. This shows we have a robust propulsion system capable of providing full mission capability to the warfighter."
AMT is conducted as a means of testing and validating reliability and maintainability performance for the engine over the span of its life. It also helps identify any potential issues well before they would be encountered by the operational fleet. Made possible by the U.S. Air Force Component Improvement Program, this test was focused on the Conventional Takeoff and Landing (CTOL) engine variant which powers both the F-35A and F-35C models. Testing took place between August 2014 and October 2017, and consisted of two hot section intervals, which is equivalent to the cold section life.
During AMT, F135 engines accumulate equivalent flight hours under monitored conditions and at a faster rate than in operating aircraft. The advanced data collection from this program identifies improvement opportunities aimed at maximizing readiness within the life cycle cost expectations for the entire F135 CTOL powered F-35 fleet.
"We're proud to work with our U.S. Air Force customer on this important accelerated mission testing as part of the Component Improvement Program," added Mr. Wiedemer. "This testing provides us an opportunity to complete a detailed inspection of the engine years before the operational fleet reaches this point to improve mission readiness, reliability and maintainability as well as reduce engine life cycle cost."
(Image provided with Pratt & Whitney news release)
More News
Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]
"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]
Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]
Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]
“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]