Mars Recon Orbiter Fires Thrusters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Sep 13, 2006

Mars Recon Orbiter Fires Thrusters

Craft In Nominal Orbit For Mars Observation

NASA's newest spacecraft at Mars has completed the challenging half-year task of shaping its orbit to the nearly circular, low-altitude pattern from which it will scrutinize the planet.

The Mars Reconnaissance Orbiter fired its six intermediate-size thrusters for 12.5 minutes Monday afternoon, shifting the low point of its orbit to stay near the Martian south pole and the high point to stay near the north pole. The altitude of the orbit ranges from 155 miles to 196 miles above the surface.

"This maneuver puts us into our science orbit," said Dan Johnston, deputy mission manager at NASA's Jet Propulsion Laboratory, Pasadena, Calif. "Getting to this point is a great achievement."

The flight team used a maneuver called "aerobraking," which used friction between the orbiter and Mars' atmosphere to reduce the altitude of the orbiter.  Aerobraking has many benefits, chief among them the reduction in fuel needed to change the craft's velocity. During the procedure, carefully managed by researchers at JPL, Lockheed Martin Space Systems in Denver, NASA's Langley Research Center and elsewhere, the craft saw altitudes as low as 61 to 65 miles.

For the first three weeks after its arrival on March 10, the spacecraft took more than 35 hours for each elongated orbit. After aerobraking, the vehicle is flying more than 10 orbits a day. "The pace of work got extremely demanding as we got down to two-hour orbits," Johnston said. "We had shifts working around the clock."

Work now begins to prepare the craft for its mission. This includes deploying a 33ft-long radar antenna, stowed during aerobraking, and removing a lens cap from an imaging spectrometer. The two-year investigation, slated to begin in November, promises to return more data about Mars than all previous Mars missions combined.

FMI: http://www.nasa.gov/mro

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC