Boeing Says Half Of Its Dreamliner Testing Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Apr 06, 2013

Boeing Says Half Of Its Dreamliner Testing Completed

Resolving The Battery Issue Taking Longer Than Originally Anticipated

Boeing says that it is half way through the testing process that it hopes will return the world's 787 fleet to service, with the rest of the ground and flight tests coming in the next week or so.

Boeing presented a potential fix to the lithium-ion battery problem to the FAA March 15th, and the agency gave its go-ahead for a flight test program. The batteries aboard a JAL Dreamliner caught fire while the airplane was sitting at a gate at Boston Logan International Airport in January. That and other issues with the batteries eventually led aviation safety agencies worldwide to ground the fleet of 49 delivered airplanes.

Reuters reports that ground testing is continuing at Boeing's labs in Seattle, and while the testing of the new battery configuration is going more slowly than the company had hoped, it is moving forward. "We are all working toward returning the 787 fleet to service in the most expeditious manner possible, but we are being thorough and won't shortcut the test and certification process," Boeing spokesman Marc Birtel said on Wednesday in a written statement.

The FAA will have to certify the new battery installation, which includes better insulation between battery cells, and a better-vented, more-robust enclosure. Additional flight tests are expected "in the coming days," Birtel said.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC