AD: HPH s. r.o. Gliders | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Apr 04, 2019

AD: HPH s. r.o. Gliders

AD NUMBER: 2019-04-01

PRODUCT: HPH s. r.o. Models Glasfügel 304C, Glasfügel 304CZ, and Glasfügel 304CZ-17 gliders.

ACTION: Final rule; request for comments.

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) issued by the aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as jamming between the double two-ring end of the towing cable and the deflector angles of the center of gravity (C.G.) release mechanism.

DATES: This AD is effective April 23, 2019. Comments must be received by May 20, 2019.

COST: The FAA estimates that this AD will affect 45 products of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • The FAA estimates it will take about 1 work-hour per product to measure the distance between the deflector angles. The average labor rate is $85 per work-hour for a cost of $85 per aircraft.
  • The FAA further estimates that any modification of the deflector angles that may be necessary as a result of the inspection will take about 4 work-hours and require parts costing $100, for a cost of $440 per product. The FAA has no way of determining the number of products that may need these actions.
FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC