CH-53K King Stallion Makes It Through Its First Sea Trials | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, Jun 30, 2020

CH-53K King Stallion Makes It Through Its First Sea Trials

Sea Trials Are A Series Of Tests To Evaluate The Performance Of The Aircraft At Sea

The CH-53K King Stallion completed a two-week period of sea trials in the Atlantic earlier this month. This was the first opportunity to see the aircraft working in a modern naval environment.

Testing took place on the USS Wasp, a landing helicopter dock (LHD) amphibious assault ship operated by the U.S. Navy.

“I’m very pleased with how the ship tests went,” said Col. Jack Perrin, H-53 helicopters program manager. “We were able to assess the K taking off and landing day, night, and with night vision goggles and it performed extremely well.”

According to the CH-53K integrated test team, the sea trials are a series of tests to evaluate the performance of the aircraft at sea. Tests performed during the two weeks included: launch and recovery; rotor start and shutdown; blade fold; and shipboard compatibility testing – all in increasing wind speed and varying wind directions relative to the aircraft.

“The bulk of the testing was in launch and recovery,” said Perrin, “and we nailed it every time, no matter what the wind/sea conditions were. The 53K is now a “feet-wet” warrior from the sea.”

Ship compatibility testing includes towing the aircraft around the deck and in the hangar, performing maintenance while aboard the ship, ensuring the aircraft fits in all the locations it needs to around the ship deck and hangar, and evaluating chain/tie-down procedures.

The CH-53K King Stallion continues to execute within the reprogrammed CH-53K timeline, moving toward completion of developmental test, leading to initial operational test and evaluation in 2021 and first fleet deployment in 2023-2024.

FMI: www.navair.mil

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC