FAA Issues Large-Scale 737 AD | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Apr 16, 2013

FAA Issues Large-Scale 737 AD

Will Require Inspection Of Horizontal Spar Attachment Pins

The FAA published an AD on Monday for certain model 737 airplanes requiring the inspection of attach pins of the horizontal stabilizer rear spar, and replacing certain attach pins with new, improved attach pins. The AD is expected to affect about 1,050 airplanes in the fleet. The cost per individual airplane is estimated to be around $9,627, for a total compliance cost to U.S. airlines of $10,108,350.

The AD covers 737-600, -700, -700C, -800, -900, and -900ER series airplanes. It is the result of reports of an incorrect procedure used to apply the wear and corrosion protective surface coating to attach pins of the horizontal stabilizer rear spar.

For airplanes having line numbers 1 through 3534 inclusive: Before the accumulation of 56,000 total flight cycles, or within 3,000 flight cycles after the effective date of this AD, whichever occurs later, inspect to determine the part number of the attach pins of the horizontal stabilizer rear spar. A review of airplane maintenance records is acceptable in lieu of this inspection if the part number of the attach pin can be conclusively determined from that review. If, during the inspection required by paragraph (g) of this AD, any horizontal stabilizer rear spar attach pin has P/N 180A1612-3 or 180A1612-4, prior to the accumulation of 56,000 total flight cycles on the pin, or within 3,000 flight cycles after the effective date of this AD, whichever occurs later, replace with a new attach pin having P/N 180A1612-7 or 180A1612-8, respectively, in accordance with the Accomplishment Instructions of Boeing Special Attention Service Bulletin 737-55-1093, dated April 9, 2012.

The FAA said is is issuing this AD to prevent premature failure of the attach pins, which could cause reduced structural integrity of the horizontal stabilizer to fuselage attachment, resulting in loss of control of the airplane. The effective date for the AD is May 20, 2013.

(737-900ER image provided by Boeing)

FMI: Federal Register

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC