Thu, Sep 04, 2008
First Deliveries Expected In 2010
It's a significant -- and needed -- advance for an aging
workhorse. Lockheed Martin announced Thursday it has won a $129.3
million contract to build a total of 13 new outer wing sets for the
US Navy's fleet of venerable P-3 Orion reconnaissance planes. The
all new production outer wings will be delivered to the Navy
beginning in early 2010 for installation on selected aircraft.
"Lockheed Martin has a long, proud history of providing P-3
sustainment and support to the US Navy," said Ray Burick, Lockheed
Martin vice president of P-3/S-3 programs. "This new wing order is
the next step in that partnership."
Lockheed Martin's P-3 wing production line opened in March 2008
and is the cornerstone of the company's P-3 Aircraft Service Life
Extension Program (ASLEP). Lockheed Martin currently has the Royal
Norwegian Air Force and the US Customs and Border Protection
Service under contract for P-3 Life Extension Kits, and has
submitted a response to the Canadian Forces under a Request For
Proposal. A proposal for the Taiwan P-3 fleet is also in work.
"As the P-3 Orion original equipment manufacturer, Lockheed
Martin is uniquely qualified to sustain and support the world's P-3
leets," said Burick. "Aside from the operators of these aircraft,
nobody knows the P-3 better than Lockheed Martin."
The complete ASLEP solution replaces the aircraft outer wings,
center wing lower section and horizontal stabilizers with new
production components. All fatigue-life limiting structures on the
aircraft are replaced with enhanced-design components and improved
corrosion-resistant materials that will greatly reduce maintenance
costs over the aircraft's service life.
"Lockheed Martin is committed to providing a range of solutions
that enables operational effectiveness for P-3 Orion operators
worldwide for decades to come," said Burick. "We're fully prepared
to support the US Navy and all our customers in their future
maritime surveillance activities."
The Boeing P-8A Poseidon, expected to replace the Orions, isn't
expected to enter service until 2013. The Navy will receive its
first of five test P-8As in 2009.
More News
Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]
“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]
"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]
UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]
Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]