FAA Proposes $585,725 Civil Penalty Against Corporate Air | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Feb 18, 2011

FAA Proposes $585,725 Civil Penalty Against Corporate Air

Alleges Company Operated An Aircraft Without Proper Maintenance

The FAA is proposing a $585,725 civil penalty against Corporate Air of Billings, MT, for allegedly operating a Shorts SD-3-30 twin-turboprop cargo aircraft when it was not in compliance with Federal Aviation Regulations.


Shorts SD-3 File Photo

The FAA alleges Corporate Air failed to maintain the aircraft under the company's general maintenance manual, which requires daily post-flight inspections that include examining the exterior skin for corrosion. In addition, the maintenance manual requires structural inspections on the basis of flight hours or flights.

The FAA alleges that Corporate Air operated the aircraft in violation of regulations on at least 81 revenue flights between Dec. 21, 2009 and Feb. 4, 2010 with corrosion that had not been detected during the post-flight inspections. The FAA also alleges that structural inspections were not conducted at the required intervals, between March 16, 2006 and February 3, 2010, in violation of federal regulations.

Corporate Air operates charter and air taxi service under Part 135 of the Federal Aviation Regulations and makes daily feeder cargo flights under contract to a major next-day air package airline.

"Keeping aircraft well-maintained and in good condition must be a top priority for any operator," said FAA Administrator Randy Babbitt.  "All operators must comply with maintenance requirements."

Corporate Air has 30 days from the receipt of the FAA's enforcement letter to respond to the agency.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC