Mon, Sep 11, 2017
Important Step Towards First Flight In 2019
Orbital ATK, a global leader in aerospace and defense technologies, recently completed an important qualification test of the avionics system for the solid rocket boosters the company has developed and is now manufacturing for NASA’s Space Launch System (SLS). Completion of this milestone is an important step toward preparing the SLS and Orion spacecraft for their first flight in 2019. Two Orbital ATK-developed five-segment rocket boosters will be used on each SLS launch to help provide initial thrust for the first two minutes of flight.
The avionics system is considered the “brains of the booster” as it starts booster ignition, communicates with the SLS launch vehicle computers during flight, and initiates booster separation upon completion of the first stage burn. The system is now qualified as meeting NASA’s demanding human-rating requirements, which provide a level of redundancy to ensure a safe flight environment through various phases of lift-off, ascent and staging.
“Completion of booster avionics system qualification is a significant step forward in supporting overall vehicle qualification and launch of the first flight of SLS – Exploration Mission-1,” said Jeff Foote, Vice President of NASA Programs for Orbital ATK’s Propulsion Systems Division. “We are proud of this accomplishment and look forward to completing full certification of the booster later this year.”
Qualification of the booster avionics system included a rigorous and comprehensive test series that thoroughly verified the fidelity of the system in a variety of expected and abnormal conditions. Key interactions confirmed during qualification testing included the ability to initiate booster ignition, control the booster during flight, and terminate flight.
The Space Launch System is NASA’s new heavy-lift launch vehicle that is being built to take crew and cargo to destinations beyond earth orbit, including to cislunar space and eventually Mars. SLS, along with the Orion spacecraft, will enable human exploration on a variety of missions to deep space. It has the greatest capacity of any launch system ever built, ensuring continued American leadership in space exploration.
(Image provided with Orbital ATK news release)
More News
Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]
Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]
Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]
Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]
"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]