Urgent CASA AD: Kawasaki | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Sep 29, 2006

Urgent CASA AD: Kawasaki

Applicability: Kawasaki Model BK117, BK117A-3, BK117A-4, BK117B-1, BK117B-2 and BK117C-1 helicopters.

Requirement:
  1. Change the life limits of Hinged Support Assy (P/N 117-421241, 117-421251, 105-42124 and 105-42125) and Bearing Bracket (P/N 117-421331 and 105-42123) in accordance with Kawasaki Service Bulletin No.KSB117-266A dated 15 September 2006 or later JCAB-approved revisions.
  2. Replace the Hinged Support Assy (P/N 117-421241, 117-421251, 105-42124 and 105-42125) and Bearing Bracket (P/N 117-421381 and 105-42123) in accordance with Kawasaki Service Bulletin No.KSB117-266A or later JCAB-approved revisions.

Note: JCAB AD No. TCD-6982-2006 dated 15 September 2006 refers.

Compliance:
  1. Within 30 days after the effective date of this AD.
  2. Before accumulating 2100 flight hours (FH). If the FH have already exceeded 1800 hours at the effective date of this AD, the parts must be replaced within the following applicable time limits: Parts which have accumulated between 1800 and 2100 FH inclusive must be replaced within the next 300 FH, after the effective date of this AD, or before reaching 2300 FH, whichever comes first. Parts which have accumulated between 2100 and 2400 FH inclusive must be replaced within the next 200 FH, after the effective date of this AD, or before reaching 2500 FH, whichever comes first. Parts which have accumulated between 2400 and 2800 FH inclusive must be replaced within the next 100 FH, after the effective date of this AD, or before reaching 2800 FH, whichever comes first. Parts which have exceeded 2800 FH, before further flight.

This Airworthiness Directive becomes effective on 4 October 2006.

Background: The actions detailed in this AD are intended to prevent fatigue failure of the flight control system.

FMI: www.casa.gov.au

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC