FAA Puts 100LL Replacement Testing On Hold | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jun 13, 2018

FAA Puts 100LL Replacement Testing On Hold

Differences Between Two Fuels Under Development Are Being Evaluated

The FAA continues to be committed to evaluating suitable replacement unleaded fuels to support general aviation. Phase Two testing of unleaded avgas continues, having completed two and a half years of testing and evaluation since the FAA's selection of the two finalists in the Piston Aviation Fuels Initiative (PAFI) replacement unleaded fuels program. To date, the flight test program is approximately one-third complete, while the engine test program is about halfway complete.

In an update on the program posted on the FAA website, the agency says that differences in the two PAFI fuels as compared to 100LL are being evaluated for impacts and mitigations. While these issues are assessed, PAFI flight testing and some engine testing have been halted. Both fuel producers, Shell and Swift, are currently evaluating options to mitigate the impacts that these differences will present in fuel production, distribution, and operation in the GA fleet. These evaluations will take time and ultimately affect the schedule of the test program. Based on current projected activities and timelines, the testing completion date for the PAFI program will be December 2019 (previously December 2018).

The FAA and industry are interested in pursuing all alternatives while issues are assessed including evaluating high-octane unleaded fuels currently being developed outside of the PAFI program. The FAA invited the fuel producers currently developing high-octane unleaded fuels to bring their data to the FAA for evaluation and consideration for possible detonation, operability, and performance testing at the FAA's William J. Hughes Technical Center. Fuel producers offering alternatives determined to have potential viability as an unleaded replacement for 100LL will be invited to participate in a Cooperative Research and Development Agreement with the FAA, which will be conducted on a non-interference basis with the PAFI program.

(Source: FAA)

FMI: Program update

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC