ILS Concludes Its Review Of Centenario Proton Launch Failure Investigation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Aug 06, 2015

ILS Concludes Its Review Of Centenario Proton Launch Failure Investigation

Agree That Higher Than Expected Vibrations Led To The Loss Of The Spacecraft

The International Launch Services (ILS) Failure Review Oversight Board (FROB) has concluded its work associated with the May 16 Proton launch failure that led to the loss of a Centenario cargo vessel carrying supplies for the ISS.

The ILS concurred with the most probable cause and the associated corrective action plan which were identified by the Russian Interagency Commission (IAC) as a result of the May 16 Proton launch vehicle failure carrying the Centenario spacecraft.

The members of the FROB reviewed the findings and conclusions from the IAC along with results from testing and investigations that the IAC directed to be performed by Khrunichev and their subsidiaries.

Based on the data presented by KhSC, the FROB agreed that the most probable cause of the failure was a result of a higher than expected vibration environment most likely caused by the combination of a marginal mechanical joint used to mount the Stage III steering engine turbo pump and a steering engine turbopump rotor material that had marginal strength under maximum operating environments. This led to a premature shutdown of the turbopump and loss of Stage III control authority and subsequently to the failure of the mission during 3rd stage operation approximately 497 seconds after liftoff.

“The participating customers, insurance underwriters and independent subject matter experts are to be commended for their valuable contributions during the extensive FROB review process. We thank our customers for their support as we prepare for the safe return to flight of ILS Proton,” said ILS Vice President and Chief Technical Officer, John Palmé.

(Proton rocket launch image from file)

FMI: www.ilslaunch.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC