AD: General Electric Company Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Jun 27, 2021

AD: General Electric Company Turbofan Engines

AD 2021-11-07 Requires Inspection Of The Stages 6-10 Compressor Rotor Spool

The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) GEnx-1B64, 1B64/P1, -1B64/P2, -1B67, -1B67/P1, -1B67/P2, -1B70, -1B70/75/P1, -1B70/75/P2, -1B70/P1, -1B70/P2, -1B70C/P1, -1B70C/P2, -1B74/75/P1, -1B74/75/P2, -1B76/P2, -1B76A/P2, -2B67, -2B67/P, and -2B67B model turbofan engines.

This AD was prompted by a finding during an inspection by the manufacturer that two stages 6-10 compressor rotor spools in the high-pressure compressor (HPC) assembly were damaged at similar locations. Additionally, the manufacturer reported that certain stages 6-10 compressor rotor spool webs did not undergo a required fluorescent penetrant inspection (FPI) during production. This AD requires inspection of the stages 6-10 compressor rotor spool and, depending on the results of the inspection, replacement of the stages 6-10 compressor rotor spool. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective July 30, 2021.

In the NPRM, the FAA proposed to require inspection of the stages 6-10 compressor rotor spool. Operators of certain affected GEnx-1B or GEnx-2B model turbofan engines have already completed acceptable inspections of the aft web of stage 6, stage 7, and stage 8 of the stages 6-10 compressor  rotor spool. The FAA proposed to require operators of those affected engines to complete the inspection of the stages 6-10 compressor rotor spool no later than the next engine shop visit. The FAA proposed to require all other remaining affected GEnx-1B and GEnx-2B model turbofan engines to complete this inspection by the next engine shop visit, before the stages 6-10 compressor rotor spools accumulate 6,500 cycles since new, or before further flight if 6,500 cycles since new has already been accumulated as of the effective date of this AD. Depending on the results of the inspection, the FAA proposed to require replacement of the stages 6-10 compressor rotor spool with a part eligible for installation. The FAA is issuing this AD to address the unsafe condition on these products.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC