New Air Traffic Control Tower Dedicated In Sarasota, Florida | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Sep 11, 2018

New Air Traffic Control Tower Dedicated In Sarasota, Florida

Project's $24.8 Million Cost Funded Through A Unique Agreement

The FAA, Sarasota Manatee Airport Authority (SMAA), and Florida Department of Transportation (FDOT) have dedicated the new Air Traffic Control Tower at Sarasota Bradenton International Airport (KSRQ). The 128 foot-tall tower is a significant investment in the nation’s airport infrastructure and enhances air traffic controllers’ ability to provide the safest, most efficient service to flights at the busy Florida airport, the FAA said in a news release.

“The Federal Aviation Administration is proud to celebrate the new tower and our working together with the Sarasota Manatee Airport Authority and Florida Department of Transportation. The new facility will provide our controllers with greater visibility of the airfield and our investment in technology will enhance their ability to provide safe and efficient air traffic services for the Sarasota Bradenton community,” said Michael O’Harra, Regional Administrator, FAA Southern Region.

The FAA, SMAA and FDOT funded the $24.8 million facility under a unique agreement. The FAA invested $7.2 million in the new tower design, engineering and electronic equipment, which the agency installed and will maintain. SMAA funded $8.9 million for construction and it will own and maintain the building. FDOT also contributed $8.7 million for tower construction. The facility includes a 9,000-square-foot base building that houses equipment, administrative offices and training rooms. The new facility includes an updated voice communications system, radio transmitter and flight data processor, which controllers use to communicate with other FAA facilities and the airport.

“The Airport Authority is proud to have partnered with the FAA and FDOT on this unique opportunity to build a new air traffic control tower. SRQ aviation users, and the local community will benefit from having this new state-of-the-art facility,” said Rick Piccolo, President and Chief Executive Officer, Sarasota Bradenton International Airport.

Air traffic controllers working in the 525 square-foot tower cab handle flights within a 10-mile radius of the airport up to 4,000 feet in altitude. In 2017, the tower handled 104,540 takeoffs and landings.

A total of 34 FAA employees work at the new facility, 20 in air traffic and 14 in technical operations, which maintains the FAA electronics equipment in the tower and on the airfield.

(Image provided with FAA news release)

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC